Corrosion Inhibitor for HESS
Customer
Overview
The North Malay Basin (NMB) is located offshore Peninsular Malaysia immediately south of the Malaysia-Thailand Joint Development Areas (MTJDA) (Figure 1), approximately 150 km North East from Kota Bharu, in 55 to 60 m water depth. The NMB area consists of Blocks PM-302 and PM-325. Hess Exploration & Production Malaysia B.V (HESS) and PETRONAS Carigali Sdn Bhd (PCSB) are contractors to PETRONAS for the Production Sharing Contracts (PSCs) and have executed a Joint Operating Agreement (JOA) between them. Pursuant to the JOA, HESS and PCSB each hold 50% participating interest for the Blocks and HESS has been appointed the Operator for the Blocks. The development projects are located within Block PM-302.
Phase 4A development includes the remote wellhead platforms in the Dahlia, Kangsar and Teratai fields, and the production to be transported to Bergading CPP via a trunk-line, targeted in Q3 2022.
|
Customer |
Hess Exploration & Production Malaysia B.V. |
|
Industry |
Oil and Gas |
|
Projects |
Chemical Injection Skid |
|
Location |
North Malay Basin Phase 4A Facilities Contract |
|
Medium |
Corrosion Inhibitor |
| Brand | Milton Roy |





Scape of Supply
Skid: WKGA
- Operating Pressure: 63.96 barg
- Operating Flowrate: 5.7 LPH
- Operating Temperature: 0 to 65°C
|
Customer |
Hess Exploration & Production Malaysia B.V. |
|
Industry |
Oil and Gas |
|
Projects |
Chemical Injection Skid |
|
Location |
North Malay Basin Phase 4A Facilities Contract |
|
Medium |
Pour Point Depressant |
|
Brand |
Milton Roy |


Scope of Supply
Skid WKGA
- Operating Pressure: 68.3 barg
- Operating Flowrate: 28.1 LPH
- Operating Temperature: 0 to 65°C
Skid WTRC
- Operating Pressure: 67.58 barg
- Operating Flowrate: 13 LPH
- Operating Temperature: 0 to 65°C
Skid WDLA
- Operating Pressure: 58.35 barg
- Operating Flowrate: 11 LPH
- Operating Temperature: 0 to 65°C
|
Customer |
Hess Exploration & Production Malaysia B.V. |
|
Industry |
Oil and Gas |
|
Projects |
Chemical Injection Skid |
|
Location |
North Malay Basin Phase 4A Facilities Contract |
|
Medium |
Methanol |
|
Brand |
Milton Roy |


Scope of Supply
Skid WKGA
- Operating Pressure: 255.7 barg
- Operating Flowrate: 500PH
- Operating Temperature: 0 to 65°C
Skid WDLA/WTRC
- Operating Pressure: 161.8 barg
- Operating Flowrate: 500 LPH
- Operating Temperature: 0 to 65°C
More Projects

In 2014, PPTSB started their Phase 1 upgrading project - they intend to upgrade a few of its Non-API compliant centrifugal pumps those with...

Sanggul Emas job scope include the Process, Mechanical Design, Material Supply, Manufacture, Inspection, Testing, Painting...

Sanggul Emas job scope include the design, procurement of materials, manufacturing, supply, performance, inspection...

Lawit A Metering process condition is one of the toughest process conditions for any sampling system to cope with...

The Anjung Field is located approximately 180 km offshore Bintulu, Sarawak with water depth of 75m in Sub-Block SK 315 with 100%...

Tangga Barat Cluster (TBC) development project consists of four (4) fields; Melor, Laho, Tangga, and Tangga Barat. The location of the...

The corrosion inhibitor chemical injection skid is composed of Milton Roy API 675 Chemical Injection Pump with an Actuator Capacity...